Bathroom renovations · Halifax

A bathroom worth locking the door for.

Steam on the glass and no reason to hurry. A long soak, a lingering shower, a little time to yourself. Let’s make room for that.

Andy Harding, involved from the first conversation.

Freestanding bathtub beside a glass shower with textured white tile
Bathroom by Priority One Renovations.

Selected bathroom work

Baths, showers and everything around them.

A freestanding tub, a glass shower, a vanity with space for two. Take a closer look at Priority One’s bathroom work.

Plan your bathroom renovation

Before the first tile comes up

What would you change?

Keep the bath or make space for a larger shower? Add storage or rethink the layout? Andy helps you weigh what’s possible in the room, what matters most and where to put your budget.

Talk with Andy
  1. 01

    Talk it through, at your place.

    Discuss your goals and budget with Andy. He visits your home to understand the space and the work you have in mind.

  2. 02

    Approve the plan and estimate.

    Review the proposed work, choices and comprehensive estimate together. You approve the plan and estimate before construction begins.

  3. 03

    Stay involved as it takes shape.

    Andy brings in the trades your project needs and discusses decisions and any changes to cost or timing with you. At handover, walk through the finished work together.

Before you begin

Your bathroom renovation questions.

What can a bathroom renovation include?

A new shower, a tub, a vanity, tile, lighting, or a different layout. Keeping the fixtures where they are is a smaller project than moving a shower, a toilet, or a wall. An ensuite and a main bath are the same kind of work, with different limits on space. Tell Andy what you want to change, from the shower you have been picturing to the room that needs a fresh start.

What affects the cost of a bathroom renovation?

The layout, fixtures, tile, and extent of the work all affect the cost. Keeping the existing arrangement is a different scope from moving a shower, toilet, or walls. Waterproofing, a new fan vented outside, and repairs found once the room is open can matter more than the size of the room. The estimate needs to reflect your choices and the work required, not just the square footage.

Can I replace a bathtub with a shower?

A tub-to-shower conversion may be possible, depending on the space, plumbing, and the type of shower you want. A shower in the same footprint is a different project from a larger shower that moves the drain or a wall. Andy can discuss those details at the site visit, along with how you want to use the room now and what may matter to you in the years ahead.

Can the layout change?

Yes, if the plumbing and the room allow it. Moving a toilet, a shower drain, or a wall is more work than replacing what is already there. In a small bath, the existing drain locations often decide what is practical. Andy checks the room before a new arrangement goes into the plan.

How long does a bathroom renovation take?

Most bathroom renovations take a few weeks once work starts, longer if the layout changes or concealed damage has to be repaired. Tile, fixtures still to be chosen, and drying time all sit on the schedule. If this is the only bathroom in the house, that gets planned before the room is taken apart. Andy can give a realistic range after seeing the space.

Do I need a permit?

Often yes, once the work moves plumbing, changes wiring, or alters the structure. Replacing a vanity or a toilet in the same location is not the same review as a new layout. Andy can confirm what your municipality requires for the scope you want, so permits are part of the plan rather than a surprise after pricing.

What happens if hidden damage is found?

Some problems only become visible once a wall or floor is opened. Andy’s restoration background helps him recognise warning signs, but it cannot reveal everything in advance. Soft subfloor, a failed shower membrane, or old leaks are the usual finds. If concealed damage changes the work required, the proposed repair and its effect on cost and timing are discussed with you before that additional work proceeds.

What has to be done before the new tile goes in?

The structure under it, the waterproofing, and the plumbing. A shower or tub surround needs a proper membrane, and the fan needs to vent outside, not into the attic or the wall. New finishes should not cover a soft floor or an open leak. That sequence is set at the visit and in the estimate.

What should I decide before the visit?

How you want to use the room, and what you already know you want to change. A shower instead of a tub, a larger shower, new tile, or a layout that stays put are enough to start. You do not need finished drawings. Photos help, and if you have a fixture or a tile in mind, bring that too. Selections still open are listed in the estimate rather than guessed.

Your bathroom renovation

Let’s talk about your escape.

Tell Andy what you’d like to change, from the shower you’ve been picturing to the room that needs a fresh start.

Or call 902-483-9498

Start the conversation

What do you want done?

Andy will call to talk through the job and arrange a visit.

Andy calls to arrange the visit. A number he can reach you on. Use 10 digits, including the area code.
No street address yet.
What are you planning?
Choose your project types
Select all that apply.
The room, what you want changed, and anything you already know is a constraint. A few sentences is enough.
Up to five files, 10 MB each.
Up to five photos, 10 MB each.
A season, a date, or still exploring.

Your details help our team respond to your enquiry. See exactly how we handle them in our Privacy Policy.